Please use this identifier to cite or link to this item: http://bura.brunel.ac.uk/handle/2438/27131
Title: Extratropical cyclone damage to the seawall in Dawlish, UK: eyewitness accounts, sea level analysis and numerical modelling
Authors: Adams, K
Heidarzadeh, M
Keywords: storm surge;cyclone;railway;climate change;infrastructure;resilience
Issue Date: 14-Nov-2022
Publisher: Springer Nature
Citation: Adams, K. and Heidarzadeh, M. (2022) 'Extratropical cyclone damage to the seawall in Dawlish, UK: eyewitness accounts, sea level analysis and numerical modelling', Natural Hazards, 116 (1), pp. 637 - 662. doi: 10.1007/s11069-022-05692-2.
Abstract: Copyright © The Author(s) 2022. The February 2014 extratropical cyclonic storm chain, which impacted the English Channel (UK) and Dawlish in particular, caused significant damage to the main railway connecting the south-west region to the rest of the UK. The incident caused the line to be closed for two months, £50 million of damage and an estimated £1.2bn of economic loss. In this study, we collate eyewitness accounts, analyse sea level data and conduct numerical modelling in order to decipher the destructive forces of the storm. Our analysis reveals that the disaster management of the event was successful and efficient with immediate actions taken to save lives and property before and during the storm. Wave buoy analysis showed that a complex triple peak sea state with periods at 4–8, 8–12 and 20–25 s was present, while tide gauge records indicated that significant surge of up to 0.8 m and wave components of up to 1.5 m amplitude combined as likely contributing factors in the event. Significant impulsive wave force of up to 286 KN was the most likely initiating cause of the damage. Reflections off the vertical wall caused constructive interference of the wave amplitudes that led to increased wave height and significant overtopping of up to 16.1 m3/s/m (per metre width of wall). With this information and our engineering judgement, we conclude that the most probable sequence of multi-hazard cascading failure during this incident was: wave impact force leading to masonry failure, loss of infill and failure of the structure following successive tides.
Description: Availability of data: All data used in this study are provided in the body of the article.
URI: https://bura.brunel.ac.uk/handle/2438/27131
DOI: https:/doi.org/10.1007/s11069-022-05692-2
ISSN: 0921-030X
Other Identifiers: ORCID iDs: Keith Adams https://orcid.org/0000-0002-4945-3188; Mohammad Heidarzadeh https://orcid.org/0000-0002-1112-1276.
Appears in Collections:Dept of Civil and Environmental Engineering Research Papers

Files in This Item:
File Description SizeFormat 
FullText.pdfCopyright © The Author(s) 2022. Rights and permissions: Open Access. This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit https://creativecommons.org/licenses/by/4.0/.7.75 MBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons