Please use this identifier to cite or link to this item: http://bura.brunel.ac.uk/handle/2438/6291
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorQin, SF-
dc.contributor.advisorWright, D-
dc.contributor.authorRuan, Jian-
dc.date.accessioned2012-03-13T10:42:42Z-
dc.date.available2012-03-13T10:42:42Z-
dc.date.issued2011-
dc.identifier.urihttp://bura.brunel.ac.uk/handle/2438/6291-
dc.descriptionThis thesis was submitted for the degree of Doctor of Philosophy and awarded by Brunel University.en_US
dc.description.abstractIn the context of internationally challenging economic, design has been regarded as a key factor in assisting design and manufacturing companies to survive. By using up-to-date computer-supported technology, the global design collaboration based on multidisciplinary and distributed environment is becoming a mainstream to new product development (NPD). However, during the process of collaborative design, risk is rarely mentioned. In particular, due to the complexity of design process and lack of efficient design decision-making, there have been some design collaboration failures across multiple companies. Some design projects cannot deliver the benefits as companies have expected through the collaboration. Moreover, a number of stakeholders, managers and designers expressed their disappointment at not seeing the projected savings in cost and time, which critically discredited the value of design collaboration. Many studies in academia and commercial cases have suggested that risk assessment can be applied as an effective means in the realm of design. Nevertheless, few of them conducted risk management research associated with design constraints under a collaborative environment from both theoretical and practical perspectives. In current risk practice, many risk practitioners simply report key risks to their management teams and no further analysis, which might subsequently result in confusion with excessive discussions. Consequently, to prevent the failure of design collaboration and perform a satisfactory risk assessment, it is important to perform risk management with an upstream perspective and at an operational level. An approach, called constraint-based design risk management (DRM) where a conceptual framework has been proposed on the basis of collaborative design features, risk management process and Theory of Constraints (TOC). Moreover, a DRM matrix has been developed to map, measure and mitigate collaborative design risk through evaluating the critical design constraints, and then specified design risk variables in the light of risk criteria. Design constraints are quantitative parameters that frequently affect main design processes and decisions. The combination of design constraints and risk criteria can be accessible and applicable by designers and design mangers. In addition, a Bayesian weighting method based on Bayesian theorem has been developed to measure collaborative design risk in a more efficient manner. Ultimately, a DRM tool has been created as a simulated scenario prototype, which incorporated with three case-study evaluations, to demonstrate the importance and effectiveness of using TOC and risk theory in the realm of design collaboration.en_US
dc.language.isoenen_US
dc.publisherBrunel University School of Engineering and Design PhD Theses-
dc.relation.urihttp://bura.brunel.ac.uk/bitstream/2438/6291/1/FulltextThesis.pdf-
dc.subjectRisken_US
dc.subjectRisk managementen_US
dc.subjectCollaborative designen_US
dc.subjectDesign constrainten_US
dc.subjectDesign managementen_US
dc.titleAn investigation of constraint-based risk management for collaborative designen_US
dc.typeThesisen_US
Appears in Collections:Design
Brunel Design School Theses

Files in This Item:
File Description SizeFormat 
FulltextThesis.pdf8.32 MBAdobe PDFView/Open


Items in BURA are protected by copyright, with all rights reserved, unless otherwise indicated.