Please use this identifier to cite or link to this item:
http://bura.brunel.ac.uk/handle/2438/19836| Title: | Beamline Status |
| Authors: | Nebrensky, H |
| Issue Date: | 2016 |
| Abstract: | Presentation at 45th MICE Collaboration Meeting (CM45), 28th-30th July 2016. https://indico.cern.ch/event/548887/timetable/ Included in the "Construction, Commissioning and Operations" track. |
| URI: | http://bura.brunel.ac.uk/handle/2438/19836 |
| Appears in Collections: | Dept of Electronic and Electrical Engineering Research Papers |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| FullText.pdf | 61.15 kB | Adobe PDF | View/Open |
Items in BURA are protected by copyright, with all rights reserved, unless otherwise indicated.