Please use this identifier to cite or link to this item: http://bura.brunel.ac.uk/handle/2438/24883
Full metadata record
DC FieldValueLanguage
dc.contributor.authorZhang, P-
dc.contributor.authorYang, P-
dc.contributor.authorZhao, Z-
dc.contributor.authorLai, CS-
dc.contributor.authorLai, LL-
dc.contributor.authorShahidehpour, M-
dc.date.accessioned2022-07-13T09:54:16Z-
dc.date.available2022-07-13T09:54:16Z-
dc.date.issued2022-07-11-
dc.identifierORCID iD: Chun Sing Lai https://orcid.org/0000-0002-4169-4438-
dc.identifier.citationZhang, P. et al. (2022) 'A Framework for Several Electricity Retailers Cooperatively Implement Demand Response to Distributed Data Center', IEEE Transactions on Smart Grid, 14 (1), pp. 277 - 289. doi: 10.1109/tsg.2022.3189835.en_US
dc.identifier.issn1949-3053-
dc.identifier.urihttps://bura.brunel.ac.uk/handle/2438/24883-
dc.description.abstractA distributed data center cluster (DDCC) consists of data centers that are geographically dispersed while managed by the same company. A DDCC is composed of several data centers in different regions, so it purchases electricity from several electricity retailers in different regions. Commonly, there is a lack of cooperation between the several electricity retailers. In this paper, a cooperation framework where several electricity retailers cooperatively implement incentive-based demand response (DR) to the same DDCC is proposed. Firstly, several electricity retailers which power for the same DDCC together publish their DR instructions to the DDCC. The DR instructions are analyzed in this paper. Then a novel DDCC energy management model is proposed for the DDCC to participate in the collaborative DR. Finally, a reasonable profit distribution mechanism is adopted for the several electricity retailers and the DDCC to allocate the entire profit of the collaborative DR. The case study verifies that the proposed cooperation framework can maximize the whole benefit of the DDCC and the several electricity retailers meanwhile ensures that the profits obtained by each member (the DDCC and the several electricity retailers) from the collaborative DR are not fewer than that of the independent operation.en_US
dc.description.sponsorshipFunding Agency: Department of Education of Guangdong Province (Grant Number: 2016KCXTD022).en_US
dc.format.extent277 - 289-
dc.format.mediumPrint-Electronic-
dc.language.isoen_USen_US
dc.publisherInstitute of Electrical and Electronics Engineers (IEEE)en_US
dc.rightsCopyright © 2022 Institute of Electrical and Electronics Engineers (IEEE). Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, in any current or future media, including reprinting/republishing this material for advertising or promotional purposes, creating new collective works, for resale or redistribution to servers or lists, or reuse of any copyrighted component of this work in other works by sending a request to pubs-permissions@ieee.org. See: https://www.ieee.org/publications/rights/rights-policies.html-
dc.rights.urihttps://www.ieee.org/publications/rights/rights-policies.html-
dc.subjectdistributed data centersen_US
dc.subjectseveral electricity retaileren_US
dc.subjectdemand responseen_US
dc.subjectcooperation frameworken_US
dc.titleA Framework for Several Electricity Retailers Cooperatively Implement Demand Response to Distributed Data Centeren_US
dc.typeArticleen_US
dc.identifier.doihttps://doi.org/10.1109/tsg.2022.3189835-
dc.relation.isPartOfIEEE Transactions on Smart Grid-
pubs.issue1-
pubs.publication-statusPublished-
pubs.volume14-
dc.identifier.eissn1949-3061-
dc.rights.holderInstitute of Electrical and Electronics Engineers (IEEE)-
Appears in Collections:Dept of Electronic and Electrical Engineering Research Papers

Files in This Item:
File Description SizeFormat 
FullText.pdfCopyright © 2022 Institute of Electrical and Electronics Engineers (IEEE). Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, in any current or future media, including reprinting/republishing this material for advertising or promotional purposes, creating new collective works, for resale or redistribution to servers or lists, or reuse of any copyrighted component of this work in other works by sending a request to pubs-permissions@ieee.org. See: https://www.ieee.org/publications/rights/rights-policies.html5.22 MBAdobe PDFView/Open


Items in BURA are protected by copyright, with all rights reserved, unless otherwise indicated.