Please use this identifier to cite or link to this item: https://bura.brunel.ac.uk/handle/2438/34174
Full metadata record
DC FieldValueLanguage
dc.contributor.authorHulak, Daniil-
dc.contributor.authorAunedi, Marko-
dc.contributor.authorNaderian, Sobhan-
dc.contributor.authorTaylor, Gareth-
dc.date.accessioned2026-11-15T12:09:27Z-
dc.date.available2026-11-15T12:09:27Z-
dc.date.issued2026-10-21-
dc.identifier.citationHulak, D. et al. (2026) 'An integrated framework for evaluating tidal stream generation potential and its power system benefits: evidence from Great Britain', Energy, 366, 142868, pp. 1–17. doi: 10.1016/j.energy.2026.142868.en_GB
dc.identifier.issn0360-5442-
dc.identifier.urihttps://bura.brunel.ac.uk/handle/2438/34174-
dc.descriptionData availability: The results generated in this study, including a complete set of QGIS-based spatial layers and PyPSA-based power system simulation code are available online via GitHub repository. [16]. GB-tidal-energy/README.md at GitHub repository. Available:online at: https://github.com/Danielckua/gb-tidal-energy/blob/main/README.md, Accessed 12th Oct 2026 .en_GB
dc.description.abstractThis paper presents an integrated framework that combines geospatial analysis with power system modelling to evaluate the optimal deployment and system-level value of tidal stream generation in Great Britain (GB). High-resolution geospatial screening – based on tidal maximum current velocity (≥2.5 m/s), mean tidal speeds (≥1.5 m/s) water depth (35–45 m and 30–50 m), and distance to shore (≤50 km) – is coupled with a multi-objective NSGA-II optimisation to identify Pareto-optimal sites for tidal stream development. The results indicate that promising locations are concentrated in a limited number of high-resource coastal regions, notably around the Orkney Islands and Pentland Firth, the Anglesey and North Wales coastline, and the Bristol Channel.These sites are subsequently incorporated into a 17-zone representation of the 2030 GB electricity system using the PyPSA model. Simulation results show that deploying 1.5 GW of tidal stream capacity – on an energy-equivalent basis in place of wind and solar PV – reduces variable renewable curtailment by 0.6 TWh, displaces a comparable volume of gas-fired generation, and lowers total system operating costs by £65 million per year. Furthermore, analysis of electricity market impacts indicates reductions in average generation costs of up to £1.0/MWh in high-cost zones, alongside relatively stable technology-specific market capture prices for tidal stream generation compared to wind and solar.The proposed framework is modular and scalable, making it applicable to other coastal regions and power systems using location-specific datasets and scenarios.en_GB
dc.description.sponsorshipGatsby Foundationen_GB
dc.format.extentpp. 1–17-
dc.languageEnglishen_GB
dc.language.isoenen_GB
dc.publisherElsevieren_GB
dc.rightsRe-use licence for this version: Creative Commons Attribution 4.0 International-
dc.rightsLicence for published version: Creative Commons Attribution 4.0 International-
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/-
dc.subjecttidal stream generationen_GB
dc.subjectgenerator capacity expansionen_GB
dc.subjectGB power systemen_GB
dc.subjectpower system simulationen_GB
dc.subjectrenewable energyen_GB
dc.subject.classification0913 Mechanical Engineering-
dc.subject.classification0914 Resources Engineering and Extractive Metallurgy-
dc.subject.classification0915 Interdisciplinary Engineering-
dc.subject.otherEnergy-
dc.titleAn integrated framework for evaluating tidal stream generation potential and its power system benefits: evidence from Great Britainen_GB
dc.typeArticleen_GB
dc.date.dateAccepted2026-10-20-
dc.identifier.doihttps://doi.org/10.1016/j.energy.2026.142868-
dc.relation.isPartOfEnergyen_GB
pubs.publication-statusPublished-
pubs.volume366-
dc.identifier.eissn1873-6785-
dc.rights.licensehttps://creativecommons.org/licenses/by/4.0/legalcode.en-
dcterms.dateAccepted2026-10-20-
dcterms.descriptionHighlights: • Integrated GIS–NSGA–PyPSA approach for tidal site screening and system assessment. • Screening identifies optimal sites using velocity, depth, and distance-to-shore. • Prime resources around Orkney/Pentland Firth, Anglesey/North Wales, Bristol Channel. • Substitution of 1.5 GW of tidal power cuts renewables curtailment by 0.6 TWh • Tidal deployment lowers annual operating costs by £65 million.en_GB
dcterms.issued2026-10-21-
dc.date.updated2026-11-15T12:00:49Z-
dc.rights.holderThe Authors-
dc.contributor.orcidHulak, Daniil [0000-0001-8840-3557]-
dc.contributor.orcidAunedi, Marko [0000-0002-8195-7941]-
dc.contributor.orcidTaylor, Gareth [0000-0003-0867-2365]-
dc.identifier.number142868-
Appears in Collections:Department of Electronic and Electrical Engineering Research Papers

Files in This Item:
File Description SizeFormat 
FullText.pdfCopyright © 2026 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY license ( https://creativecommons.org/licenses/by/4.0/ ).10.92 MBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons