Please use this identifier to cite or link to this item: https://bura.brunel.ac.uk/handle/2438/34140
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAbualshawareb, Abdelaziz-
dc.contributor.authorDehouche, Zahir-
dc.contributor.authorKönig, Carola S-
dc.contributor.authorSchmidt Rivera, Ximena-
dc.contributor.authorRibas, Sergi-
dc.contributor.authorPisica, Ioana-
dc.date.accessioned2026-11-08T12:43:02Z-
dc.date.available2026-11-08T12:43:02Z-
dc.date.issued2026-09-17-
dc.identifier.citationAbualshawareb, A. et al. (2026) 'Grid‐Constrained Sizing and Predictive Dispatch of a PV–Battery–Hydrogen Energy Community: An Island Case Study', International Journal of Energy Research, 2026(1), pp. 1–23. doi: 10.1155/er/5550759.en_GB
dc.identifier.issn0363-907X-
dc.identifier.urihttps://bura.brunel.ac.uk/handle/2438/34140-
dc.descriptionData Availability Statement: The data that support the findings of this study are available upon request from the corresponding author. The data are not publicly available due to privacy or ethical restrictions.en_GB
dc.description.abstractGrid‐connected energy communities on weak or capacity‐limited feeders increasingly consider hybrid photovoltaic (PV)–battery–hydrogen systems yet planning studies often size assets against annual balances while leaving the grid connection as an effectively unconstrained buffer. Here, we develop a boundary‐centred planning architecture that couples long‐horizon investment decisions to schedule‐feasible operation. A genetic algorithm (GA) selects component capacities, inverter rating, and contracted import/export power, while a rolling‐horizon (MILP) formulation implements model predictive control (MPC) resolves tariff‐coupled dispatch with bounded daily load shifting. Using a public‐sector community on the island of Formentera (Spain), we benchmark reactive load‐following against predictive operation under 0% to 8% flexible demand. Predictive coordination reshapes both, sizing and energy flows by converting temporal foresight into “capacity value” at the point of common coupling. Relative to load‐following, the optimiser tightens the contracted exchange envelope from ±78 to ±37 kW and reduces the inverter rating from 120 to 77 kW, while increasing PV utilisation and reducing grid import reliance to roughly 9%–11% of demand. These gains arise from coordinated storage operation: the battery provides mostly short‐term balancing, while hydrogen supplies a smaller secondary contribution through surplus absorption and occasional deficit support. Economically, modest flexibility amplifies the effect, reducing net present cost (NPC) by 9% and lowering levelised electricity cost (LCOE) from 0.243 to 0.218 €/kWh. Together, the results show that hybrid community value is anchored in enforceable boundary control, and that limited behavioural adaptation can substitute for contracted capacity in weak‐grid planning.en_GB
dc.description.sponsorshipHorizon 2020 Framework Programme for the VPP4Islands project (Virtual Power Plant for Interoperable and Smart isLANDS) under grant number: 957852en_GB
dc.format.extentpp. 1–23-
dc.format.mediumPrint-Electronic-
dc.languageEnglishen_GB
dc.language.isoenen_GB
dc.publisherWileyen_GB
dc.rightsRe-use licence for this version: Creative Commons Attribution 4.0 International-
dc.rightsLicence for published version: Creative Commons Attribution 4.0 International-
dc.rightsFor the purposes of open access, the author has applied a Creative Commons Attribution (CC BY) Licence to any Accepted Author Manuscript version arising from this submission.-
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/-
dc.subject.classification0904 Chemical Engineering-
dc.subject.classification0906 Electrical and Electronic Engineering-
dc.subject.classification0913 Mechanical Engineering-
dc.subject.otherEnergy-
dc.titleGrid‐Constrained Sizing and Predictive Dispatch of a PV–Battery–Hydrogen Energy Community: An Island Case Studyen_US
dc.typeArticleen_US
dc.date.dateAccepted2026-08-14-
dc.identifier.doihttps://doi.org/10.1155/er/5550759-
dc.relation.isPartOfInternational Journal of Energy Researchen_GB
pubs.issue1-
pubs.publication-statusPublished-
pubs.volume2026-
dc.identifier.eissn1099-114X-
dc.rights.licensehttps://creativecommons.org/licenses/by/4.0/legalcode.en-
dcterms.dateAccepted2026-08-14-
dcterms.issued2026-09-17-
dcterms.rightsFor the purposes of open access, the author has applied a Creative Commons Attribution (CC BY) Licence to any Accepted Author Manuscript version arising from this submission.-
dc.date.updated2026-11-08T12:35:40Z-
dc.rights.holderAbdelaziz Abualshawareb et al.-
dc.contributor.orcidAbualshawareb, Abdelaziz [0000-0002-5998-8338]-
dc.contributor.orcidDehouche, Zahir [0000-0001-9201-9160]-
dc.contributor.orcidKönig, Carola [0000-0002-9289-3154]-
dc.contributor.orcidSchmidt Rivera, Ximena [0000-0003-0157-2679]-
dc.contributor.orcidPisica, Ioana [0000-0002-9426-3404]-
dc.identifier.number5550759-
Appears in Collections:Department of Mechanical and Aerospace Engineering Research Papers
Department of Electronic and Electrical Engineering Research Papers
Department of Chemical Engineering Research Papers

Files in This Item:
File Description SizeFormat 
FullText.pdfCopyright © 2026 Abdelaziz Abualshawareb et al. International Journal of Energy Research published by John Wiley & Sons Ltd. This is an open access article under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0/), which permits use, distribution and reproduction in any medium, provided the original work is properly cited. For the purposes of open access, the author has applied a Creative Commons Attribution (CC BY) Licence to any Accepted Author Manuscript version arising from this submission.3.87 MBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons