Please use this identifier to cite or link to this item:
http://bura.brunel.ac.uk/handle/2438/22791
Title: | Two-stage optimal scheduling of air conditioning resources with high photovoltaic penetrations |
Authors: | Wang, D Wu, R Li, X Lai, CS Wu, X Wei, J Xu, Y Wu, W Lai, LL |
Keywords: | air conditioning resources;mixed integer linear programming;rolling horizon optimization;two-stage optimal scheduling |
Issue Date: | 12-Sep-2019 |
Citation: | Wang, D., Wu, R., Li, X., Lai, C.S., Wu, X., Wei, J., Xu, Y., Wu, W. and Lai, L.L. (2019) 'Two-stage optimal scheduling of air conditioning resources with high photovoltaic penetrations', Journal of Cleaner Production, 241, 118407, pp. 1-14. doi: 10.1016/j.jclepro.2019.118407. |
URI: | https://bura.brunel.ac.uk/handle/2438/22791 |
DOI: | https://doi.org/10.1016/j.jclepro.2019.118407 |
ISSN: | 0959-6526 |
Appears in Collections: | Dept of Electronic and Electrical Engineering Embargoed Research Papers |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
FullText.pdf | Embargoed until 12 September 2021 | 1.36 MB | Adobe PDF | View/Open |
Items in BURA are protected by copyright, with all rights reserved, unless otherwise indicated.